Formwork is temporary or permanent molds into which concrete or similar materials are poured. In the context of concrete construction, the falsework supports. 19 Oct MIVAN SHUTTERING Mivan is the name of Malaysian company which invented ” Aluminium Formwork” in So, it often called mivan. In MIVAN formwork we give stress on shear wall rather than conventional framed structure of columns and beams. In general the design of a wall formwork is.

Author: Mulkree Shakalkis
Country: Algeria
Language: English (Spanish)
Genre: Finance
Published (Last): 25 May 2007
Pages: 175
PDF File Size: 15.95 Mb
ePub File Size: 10.38 Mb
ISBN: 967-7-61710-475-1
Downloads: 79141
Price: Free* [*Free Regsitration Required]
Uploader: Garisar

Merits And Demerits Of Mivan Technology

In external walls, ties used in shutter connection create holes in wall after deshuttering. As all the walls are cast monolithic and simultaneously with floor slabs requiring no further plasters finish.

From Wikipedia, sbuttering free encyclopedia. This innovative form of work is quite suitable for constructing houses in large volumes at a faster speed. Email required Address never made public. Shortage of construction manpower and mounting costs has forced the developers to try new technologies. Civil engineers not only build but also enhance the quality of life.

The construction activities are divided as pre — concrete activities, during concreting and post — concrete activities.

Placement Of Aluminium Formwork — Along the wall reinforcing steel, prefabricated floor slabs, and room-sized walls are erected. Normally adjustable metal props similar to or the same as those used by beam slab formwork are used to support these systems. System components are durable and can be used several times without sacrificing the quality or correctness of dimensions and surface.

This technique enjoys popularity in the US, Europe and generally in high labor cost countries. A single panel at a corner will give sufficient lateral support to a very long section of wall. If a deviation from plumb has occurred in two directions, then this should be improved over two floors, one for each direction.

There is an increasing focus on sustainability in design, backed up by carbon dioxide emissions reduction targets. Properties Degradation Environmental impact Recycling Segregation in concrete Alkali—silica reaction. Final positioning adjustments can be made by trolley.

Realignment in two directions should not attempted on a single lift. Further, the system is quite flexible and can be easily adapted for any variations in the layout. The natural density of concrete wall result in better sound transmission coefficient. In practice, there are only two sizes for formwork; small-sized and large-sized.

The wall shutters are erected in hrs One of the major activity reinforcement requires hrs.

What Is Mivan Technology? When working on the outside edge, safety equipment MUST be worn at all whuttering. This in turn means the formwork is not in plumb. When concrete is placed, it is in plastic state. The method of construction adopted is no difference except for that the sub — structure is constructed using conventional techniques. Leave a Suhttering Cancel reply Your email address will not be published. Special care must be taken at the lift shafts.

Simplified foundation design due to consistent load distribution. Striking times should be confirmed on a project to project basis.

Merits And Demerits Of Mivan Technology

This article needs additional citations for verification. Concrete Concrete buildings and structures Building materials Construction terminology. MIVAN aims in using modern construction techniques and equipment in all its projects. Factually, Mivan is an aluminium formwork system manufactured by Mivan Company Ltd, Malaysia in the year Further, the construction speed is high and the work can be done in a shittering effective manner.

The striking begins with the removal of deck beam. During this operation, the person on the external must have his safety belt secured to the kicker above. Once the panels have been numbered, measuring is not necessary. By varying the geometry of the fabric mould with distance along the beam, the optimised shape is created.

The reduction of cost is also due to the elimination of brickwork and plaster and also due to reduction in time.

Formwork – Wikipedia

Ensure the kickers are level and will not effect the vertically of the lift shaft. The panels are held in position by a simple pin and wedge arrangement system that passes through holes in the outside rib of each panel. The complicated three-dimensional nature of an element involving suspended panels and riser boards, as well as the need to cope with very different spatial and dimensional variances as required by individual design situations, cannot be achieved by a universally adaptable formwork system.

A period of hrs is left after concreting for the concrete to gain strength before the beginning of the next cycle.

The availability of concrete from ready mix concrete facility has augured well for the use of this work system. The heaviest and the longest, which is a full height wall panel, can be carried up the nearest shutetring.

Requirements of a good formwork The essential requirements of formwork or shuttering are: High quality Formwork panels ensure consistency of dimensions. Materials used for formwork are traditionally quite limited due to finding the difficult balance between cost and performance.

The interior panels will align properly on their own because they are set of the kicker from the formwork below. This component supports the deck and beam. Skilled miavn is required for alignment maintenance. By using this site, you agree to the Terms of Use and Privacy Policy.